Allen Construction — 201 N Milpas St, Santa Barbara, CA 93103

Yes. 201 N Milpas St has 3 Level 2 restricted-access chargers, up to 4 kW, with J1772 plug. Free. Verified Nov 13, 2025.

3 Charging Ports at This Location

ChargerPortsPlugsMax powerNetworkPriceStatusSourceAccess
Charger 13 Level 2J17724 kWNon-networkedFreeOpen · Verified Nov 13, 2025U.S. DOE (NREL)Public — Public - Call ahead

Location Facts

Pricing
Free
Hours
8am-5pm M-F; employee use prioritized, call to register with front desk before arrival; maximum 3 hours
Access
Public, with restrictions — Public - Call ahead
Max power
4 kW
Nearest DC fast alternative
Santa Barbara Eastside Library — 0.2 mi
Last verified

Nearest Charging Locations

Frequently Asked Questions

How many chargers are at Allen Construction on 201 N Milpas St?

Allen Construction has 3 charging ports: 3 Level 2.

Which plugs does Allen Construction in Santa Barbara have?

J1772, with up to 4 kW.

Is there DC fast charging at 201 N Milpas St, Santa Barbara, CA 93103?

No. Allen Construction has Level 2 charging only (3 ports). The nearest DC fast charging is Santa Barbara Eastside Library, 0.2 mi away.

How much does charging cost at Allen Construction, Santa Barbara?

Free (as listed Nov 13, 2025).

When is Allen Construction in Santa Barbara open?

8am-5pm M-F; employee use prioritized, call to register with front desk before arrival; maximum 3 hours.

Can anyone charge at Allen Construction in Santa Barbara?

The chargers are public with restrictions: Public - Call ahead.

Related Pages