Midstate Electric Co-op — 16755 Finley Butte Road, LA Pine, OR 97739
Yes. 16755 Finley Butte Road has 2 Level 2 public chargers on ZEF, up to 4 kW, with J1772 plug. Verified Oct 21, 2026.
2 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 2 Level 2 | J1772 | 4 kW | ZEF | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
Location Facts
- Network
- ZEF
- Access
- Public
- Max power
- 4 kW
- Nearest DC fast alternative
- La Pine Transit Center — 0.8 mi, up to 50 kW
- Last verified
Nearest Charging Locations
- La Pine Transit Center 51487 U.S. 97 · ZEF · 4 ports · up to 50 kW · 0.8 mi
- EV Connect EV Charging 52530 Us-97 · EV Connect · 2 ports · up to 50 kW · 3.0 mi
- Sunriver Brewing 56840 Venture Lane · ZEF · 4 ports · up to 4 kW · 13.9 mi
- Powder Village Condos 56856 Enterprise Drive · ZEF · 2 ports · up to 4 kW · 13.9 mi
- The Great Hall 57081 Great Hall Loop · ZEF · 4 ports · up to 4 kW · 14.4 mi
- Sunriver Resort 57071 Great Hall Loop · Tesla Destination · 1 port · up to 4 kW · 14.4 mi
- Lodge 17600 Center Drive · ChargePoint · 1 port · 14.5 mi
- The Woodsman Country Lodge 136740 Us-97 · 2 ports · up to 4 kW · 17.4 mi
- Rivian Adventure EV Charging 136590 The Dalles-California Hwy · Rivian Adventure · 6 ports · up to 200 kW · 17.6 mi
Frequently Asked Questions
How many chargers are at Midstate Electric Co-op on 16755 Finley Butte Road?
Midstate Electric Co-op has 2 charging ports: 2 Level 2, on the ZEF network.
Which plugs does Midstate Electric Co-op in LA Pine have?
J1772, with up to 4 kW.
Is there DC fast charging at 16755 Finley Butte Road, LA Pine, OR 97739?
No. Midstate Electric Co-op has Level 2 charging only (2 ports). The nearest DC fast charging is La Pine Transit Center, 0.8 mi away.
Can anyone charge at Midstate Electric Co-op in LA Pine?
Yes, the chargers are listed as open to the public.