Bedrock 1ST ST GRG — 1401 1st Street, Detroit, MI 48226

Yes. 1401 1st Street has 4 Level 2 public chargers on ChargePoint, up to 4 kW, with J1772 plug. Open 24/7. Verified Oct 21, 2026.

4 Charging Ports at This Location

ChargerPortsPlugsMax powerNetworkPriceStatusSourceAccess
Charger 12 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 22 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public

Location Facts

Network
ChargePoint
Hours
24 hours daily
Access
Public
Max power
4 kW
Nearest DC fast alternative
Blue Energy Beacon Park — 0.2 mi, up to 50 kW
Last verified

Nearest Charging Locations

More ChargePoint Locations Nearby

  • Bedrock WW 35 State St · ChargePoint · 6 ports · up to 4 kW · 0.4 mi
  • Bedrock OCM 1140 Farmer St · ChargePoint · 2 ports · up to 4 kW · 0.4 mi
  • Bedrock Z Deck 219 Gratiot Ave · ChargePoint · 16 ports · up to 16 kW · 0.5 mi
  • Bedrock Buhl 525 Griswold St · ChargePoint · 8 ports · up to 4 kW · 0.5 mi
  • Bedrock OCM 1140 Farmer St · ChargePoint · 34 ports · up to 4 kW · 0.5 mi
  • Bedrock First Nat'l 609 Bates St · ChargePoint · 6 ports · up to 17 kW · 0.6 mi

Frequently Asked Questions

How many chargers are at Bedrock 1ST ST GRG on 1401 1st Street?

Bedrock 1ST ST GRG has 4 charging ports: 4 Level 2, on the ChargePoint network.

Which plugs does Bedrock 1ST ST GRG in Detroit have?

J1772, with up to 4 kW.

Is there DC fast charging at 1401 1st Street, Detroit, MI 48226?

No. Bedrock 1ST ST GRG has Level 2 charging only (4 ports). The nearest DC fast charging is Blue Energy Beacon Park, 0.2 mi away.

When is Bedrock 1ST ST GRG in Detroit open?

24 hours daily.

Can anyone charge at Bedrock 1ST ST GRG in Detroit?

Yes, the chargers are listed as open to the public.

Related Pages