Pinto Construction Co — 132 Dingens St, Buffalo, NY 14206
Yes. 132 Dingens St has 6 Level 2 public chargers on Red E Charge, up to 4 kW, with J1772 plug. Verified Oct 21, 2026.
6 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 6 Level 2 | J1772 | 4 kW | Red E Charge | Not listed | Open · Verified Oct 21, 2026 | U.S. DOE (NREL) | Public |
Location Facts
- Network
- Red E Charge
- Access
- Public
- Max power
- 4 kW
- Nearest DC fast alternative
- Tesla Supercharger — 1.4 mi, up to 50 kW
- Last verified
Nearest Charging Locations
- Bear Metal Works 39 Scoville Avenue · synergEV · 4 ports · 1.0 mi
- Apartments at the Lyceum 87 Swinburne Street · ChargeSmart EV · 2 ports · up to 4 kW · 1.2 mi
- Tesla Supercharger 800 Harlem Rd · Tesla · 8 ports · up to 50 kW · 1.4 mi
- Aldi Broadway TUL 998 Broadway St · Red E Charge · 4 ports · 1.8 mi
- Eckhardt Lofts 950 Broadway · Noodoe · 4 ports · 1.8 mi
- Glpizza.com GL Pizza Left 444 Indian Church Rd · ChargePoint · 4 ports · up to 4 kW · 1.9 mi
- EV Connect EV Charging 1890 Bailey Ave · EV Connect · 3 ports · up to 4 kW · 1.9 mi
- Seneca 799 Seneca St · ChargePoint · 15 ports · up to 4 kW · 1.9 mi
- Larkin 726 Exchange St · ChargePoint · 10 ports · up to 4 kW · 2.0 mi
- Buffalo Academy Of Science Charter School 335 Doat St. · ViaLynk · 4 ports · up to 4 kW · 2.1 mi
More Red E Charge Locations Nearby
- Designer Homes 4781 Transit Rd. · Red E Charge · 4 ports · 5.8 mi
- Aldi TUL Elmwood 2090 Elmwood Ave · Red E Charge · 4 ports · up to 320 kW · 6.3 mi
- Aldi Tonawanda 3939 Niagara Falls Blvd · Red E Charge · 8 ports · up to 150 kW · 12.2 mi
- The City Church Parking Lot 210 E Main St · Red E Charge · 2 ports · 32.8 mi
- Larry Spacc GMC 4037 Vineyard Dr · Red E Charge · 5 ports · up to 50 kW · 39.1 mi
- Aldi Geneseo TUL 4566 Morganview Rd · Red E Charge · 8 ports · up to 150 kW · 52.5 mi
Frequently Asked Questions
How many chargers are at Pinto Construction Co on 132 Dingens St?
Pinto Construction Co has 6 charging ports: 6 Level 2, on the Red E Charge network.
Which plugs does Pinto Construction Co in Buffalo have?
J1772, with up to 4 kW.
Is there DC fast charging at 132 Dingens St, Buffalo, NY 14206?
No. Pinto Construction Co has Level 2 charging only (6 ports). The nearest DC fast charging is Tesla Supercharger, 1.4 mi away.
Can anyone charge at Pinto Construction Co in Buffalo?
Yes, the chargers are listed as open to the public.