LGT MUNICIPAL SITE
LGT MUNICIPAL SITE is an EV charging station located at 1130 N Bethlehem Pike, Spring House, Pennsylvania. It offers 2 charging ports on the ChargePoint Network network.
Location
1130 N Bethlehem PikeSpring House, PA 19477
Coordinates: 40.1884250, -75.2257810
Access: public — Public
Network
ChargePoint Network
Charging Details
| Type | Ports |
|---|---|
| Level 2 | 2 |
Max power: 3.7 kW
Connector Breakdown
| Connector | Level | Power |
|---|---|---|
| J1772 | Level 2 | ≤19.2 kW |
Hours & Access
24 hours daily
Nearby Charging Stations
-
Swtch Energy
— SWTCH
(6 L2)
250 S Maple St -
Electric Circuit Charging Station
— Non-Networked
250 S Maple St, Ambler -
ChargePoint Charging Station
— Non-Networked
805 Loch Alsh Ave, Fort Washington -
AMBLER POPLAR
— ChargePoint Network
(2 L2)
113 Poplar St -
AMBLER RACE
— ChargePoint Network
(2 L2)
157 Race St -
Weavers Way Co-op
— Non-Networked
(2 L2)
217 E Butler Ave
Station Actions
Is This Information Correct?
Station details change frequently. If this station's hours, pricing, or availability are wrong, view on the map and submit a correction to help fellow EV drivers.