Eagle Group Eagle — 100 Industrial Blvd, Clayton, DE 19938

Yes. 100 Industrial Blvd has 4 Level 2 public chargers on ChargePoint, up to 4 kW, with J1772 plug. Verified Oct 19, 2026.

4 Charging Ports at This Location

ChargerPortsPlugsMax powerNetworkPriceStatusSourceAccess
Charger 12 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 19, 2026U.S. DOE (NREL)Public
Charger 22 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 19, 2026U.S. DOE (NREL)Public

Location Facts

Network
ChargePoint
Hours
Mon: 12:00am-7:00am, 5:00pm-11:59pm; Tue: 12:00am-7:00am, 5:00pm-11:59pm; Wed: 12:00am-7:00am, 5:00pm-11:59pm; Thu: 12:00am-7:00am, 5:00pm-11:59pm; Fri: 12:00am-7:00am, 5:00pm-11:59pm; Sat: 12:00am-7:00am, 5:00pm-11:59pm; Sun: 12:00am-7:00am, 5:00pm-11:59pm
Access
Public
Max power
4 kW
Nearest DC fast alternative
Willis Ford — 1.6 mi, up to 4 kW
Last verified

Nearest Charging Locations

More ChargePoint Locations Nearby

Frequently Asked Questions

How many chargers are at Eagle Group Eagle on 100 Industrial Blvd?

Eagle Group Eagle has 4 charging ports: 4 Level 2, on the ChargePoint network.

Which plugs does Eagle Group Eagle in Clayton have?

J1772, with up to 4 kW.

Is there DC fast charging at 100 Industrial Blvd, Clayton, DE 19938?

No. Eagle Group Eagle has Level 2 charging only (4 ports). The nearest DC fast charging is Willis Ford, 1.6 mi away.

When is Eagle Group Eagle in Clayton open?

Mon: 12:00am-7:00am, 5:00pm-11:59pm; Tue: 12:00am-7:00am, 5:00pm-11:59pm; Wed: 12:00am-7:00am, 5:00pm-11:59pm; Thu: 12:00am-7:00am, 5:00pm-11:59pm; Fri: 12:00am-7:00am, 5:00pm-11:59pm; Sat: 12:00am-7:00am, 5:00pm-11:59pm; Sun: 12:00am-7:00am, 5:00pm-11:59pm.

Can anyone charge at Eagle Group Eagle in Clayton?

Yes, the chargers are listed as open to the public.

Related Pages