Village of Shadyside
Village of Shadyside is an EV charging station located at 100 Denniston Street, Pittsburgh, Pennsylvania. It offers 1 charging port on the ZEFNET network.
Village of Shadyside is an EV charging station in Pittsburgh, Pennsylvania on the ZEFNET network. It has 1 charging port (1 Level 2 port) with charging speeds up to 3.7 kW.
Location
100 Denniston StreetPittsburgh, PA 15206
Coordinates: 40.4575200, -79.9190900
Access: public — Public
Network
ZEFNET
Charging Details
| Type | Ports |
|---|---|
| Level 2 | 1 |
Max power: 3.7 kW
Connector Breakdown
| Connector | Level | Power |
|---|---|---|
| J1772 | Level 2 | ≤19.2 kW |
Nearby Charging Stations
-
Epic Metals Plant Parking Lot
— Blink Network
(4 L2)
11 Talbot Avenue -
Hazelwood Green
— FLO
(10 L2)
4500 Lytle Street -
Giant Eagle #63 - Greenfield
— Non-Networked
(1 L2)
4250 Murray Ave -
Electric Era Charging Station
— ELECTRIC_ERA
(4 DCFC)
4250 Murray Ave -
Swissvale Borough 24/7 Public Access
— FLO
(5 L2)
7301 Schoyer Ave -
Edgewood Towne Center
— eVgo Network
(4 DCFC)
1775 S Braddock Ave
Frequently Asked Questions
How many charging ports does Village of Shadyside have?
Village of Shadyside in Pittsburgh, Pennsylvania has 1 Level 2 port on the ZEFNET network.
What connector types are available at Village of Shadyside?
Village of Shadyside supports the following EV connectors: J1772.
What charging speeds are available at Village of Shadyside?
Village of Shadyside provides Level 2 charging at up to 3.7 kW. DC fast charging is not available at this location.
Who can use Village of Shadyside?
Village of Shadyside access: public — Public.
Where is Village of Shadyside located?
Village of Shadyside is located at 100 Denniston Street, Pittsburgh, PA 15206.
Station Actions
Is This Information Correct?
Station details change frequently. If this station's hours, pricing, or availability are wrong, view on the map and submit a correction to help fellow EV drivers.