Jojo Superfast EV Charging Stations

Jojo Superfast has 3 charging locations with 24 ports: 24 DC fast ports. Its locations are in 1 states. The largest Jojo Superfast fast site in the US is Jojo Superfast Bridgeview at 9140 S Harlem Ave in Bridgeview, with 8 DC fast ports, up to 200 kW. All 3 are in Illinois. Every state's locations are linked below.

ChargingNear.me lists 24 charging ports at 3 Jojo Superfast locations in the US, including 24 DC fast ports (DOE AFDC and Open Charge Map data, updated Nov 17, 2026).

About Jojo Superfast

Website: https://www.jojosuperfast.com

Network at a Glance

Charging locations
3
Ports
24
DC fast ports
24
Level 2 ports
0
States covered
1

Connector Types

ConnectorCharging locations
CCS3
NACS / Tesla3

Top Cities for Jojo Superfast

  1. Bridgeview, IL — 1 charging location
  2. Crestwood, IL — 1 charging location
  3. Tinley Park, IL — 1 charging location

State Coverage

StateCharging locations
Illinois3

Jojo Superfast Locations by State

Featured Jojo Superfast Stations

Jojo Superfast History and Charging Power

DOE AFDC dates Jojo Superfast's first charger in the US to Mar 2026, at Jojo Superfast Crestwood. 3 locations opened in the last 12 months, most recently Jojo Superfast Tinley Park (Jun 2026). By DOE AFDC's per-port power for Jojo Superfast in the US, CCS reaches 200 kW at Jojo Superfast Crestwood and NACS tops out at 200 kW at Jojo Superfast Crestwood.

0 Jojo Superfast locations in the US have a station that passes ChargingNear.me's NEVI check: four CCS ports at 150 kW or more, within 1 mile of an FHWA EV corridor. Source: ChargingNear.me NEVI-grade file (DOE AFDC, FHWA corridors) data, updated Nov 18, 2026.

Questions About Jojo Superfast Charging

How many Jojo Superfast charging locations are there?

Jojo Superfast has 3 charging locations with 24 ports: 24 DC fast ports. Its locations are in 1 states. All 3 are in Illinois. Source: DOE AFDC and Open Charge Map data, updated Nov 17, 2026. DOE AFDC dates Jojo Superfast's first charger in the US to Mar 2026, at Jojo Superfast Crestwood. 3 locations opened in the last 12 months, most recently Jojo Superfast Tinley Park (Jun 2026).

Where are Jojo Superfast fast chargers in the US?

Jojo Superfast has 24 DC fast ports at 3 locations in the US. The largest is Jojo Superfast Bridgeview at 9140 S Harlem Ave in Bridgeview, with 8 DC fast ports, up to 200 kW. Next is Jojo Superfast Crestwood at 4701 W Cal Sag Rd in Crestwood, with 8 DC fast ports, up to 200 kW. Then Jojo Superfast Tinley Park at 6851 W 159th St in Tinley Park, with 8 DC fast ports, up to 200 kW.

What plugs do Jojo Superfast chargers in the US have?

Among Jojo Superfast's locations in the US, 3 locations have CCS and 3 locations have NACS. By DOE AFDC's per-port power for Jojo Superfast in the US, CCS reaches 200 kW at Jojo Superfast Crestwood and NACS tops out at 200 kW at Jojo Superfast Crestwood. CCS is the fast-charging plug on most non-Tesla EVs.

How much does Jojo Superfast charging cost in the US?

The lowest listed Jojo Superfast price in the US is $0.50/kWh at Jojo Superfast Crestwood, per DOE AFDC as of Nov 12, 2026. 3 Jojo Superfast locations in the US list a per-kWh price. No Jojo Superfast location in the US lists free charging.

When did Jojo Superfast open its first charger in the US?

DOE AFDC dates Jojo Superfast's first charger in the US to Mar 2026, at Jojo Superfast Crestwood. 3 locations opened in the last 12 months, most recently Jojo Superfast Tinley Park (Jun 2026). Each location page lists its plugs, power, hours and price.

Source: DOE AFDC and Open Charge Map data, updated Nov 17, 2026, with ChargingNear.me's own checks.