Bryant Venture Phase 1-A&C,LLC

Bryant Venture Phase 1-A&C,LLC is an EV charging station located at Master Association 680 Rhode Island Ave NE, Washington, District of Columbia. It offers 2 charging ports on the Blink Network network.

Bryant Venture Phase 1-A&C,LLC is an EV charging station in Washington, District of Columbia on the Blink Network network. It has 2 charging ports (2 Level 2 ports) with charging speeds up to 3.7 kW. Access: 24 hours daily.

Location

Master Association 680 Rhode Island Ave NE
Washington, DC 20002

Coordinates: 38.9219130, -76.9968757

Access: public — Public

Network

Blink Network

Charging Details

TypePorts
Level 22

Max power: 3.7 kW

Connector Breakdown

ConnectorLevelPower
J1772Level 2≤19.2 kW

Hours & Access

24 hours daily

Nearby Charging Stations

Frequently Asked Questions

How many charging ports does Bryant Venture Phase 1-A&C,LLC have?

Bryant Venture Phase 1-A&C,LLC in Washington, District of Columbia has 2 Level 2 ports on the Blink Network network.

What connector types are available at Bryant Venture Phase 1-A&C,LLC?

Bryant Venture Phase 1-A&C,LLC supports the following EV connectors: J1772.

What charging speeds are available at Bryant Venture Phase 1-A&C,LLC?

Bryant Venture Phase 1-A&C,LLC provides Level 2 charging at up to 3.7 kW. DC fast charging is not available at this location.

What are the hours for Bryant Venture Phase 1-A&C,LLC?

Bryant Venture Phase 1-A&C,LLC is accessible 24 hours daily.

Who can use Bryant Venture Phase 1-A&C,LLC?

Bryant Venture Phase 1-A&C,LLC access: public — Public.

Where is Bryant Venture Phase 1-A&C,LLC located?

Bryant Venture Phase 1-A&C,LLC is located at Master Association 680 Rhode Island Ave NE, Washington, DC 20002.

Station Actions

Is This Information Correct?

Station details change frequently. If this station's hours, pricing, or availability are wrong, view on the map and submit a correction to help fellow EV drivers.