Santa Barbara City College — 721 Cliff Dr, Santa Barbara, CA 93109
Yes. 721 Cliff Dr has 8 Level 2 public chargers on ChargePoint, up to 4 kW, with J1772 plug. $0.20/kWh. Verified Oct 19, 2026.
8 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Sbcc | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 19, 2026 | U.S. DOE (NREL) | Public |
| Sbcc | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 19, 2026 | U.S. DOE (NREL) | Public |
| Charger 3 | 4 Level 2 | J1772 | 4 kW | ChargePoint | $0.20/kWh | Open · Verified Nov 11, 2025 | U.S. DOE (NREL) | Public |
Location Facts
- Network
- ChargePoint
- Pricing
- $0.20 per kWh
- Hours
- Mon: 5:00am-11:00pm; Tue: 5:00am-11:00pm; Wed: 5:00am-11:00pm; Thu: 5:00am-11:00pm; Fri: 5:00am-11:00pm; Sat: 5:00am-11:00pm; Sun: 5:00am-11:00pm
7am-10pm for students with permit; available to public on the weekend - Access
- Public
- Max power
- 4 kW
- Nearest DC fast alternative
- CSG EV SB Ortega — 1.1 mi, up to 4 kW
- Last verified
Nearest Charging Locations
- Sbcc Lot 721 Cliff Drive · ChargePoint · 4 ports · up to 4 kW · 0.4 mi
- CSG EV SB Fleet Waterf 117 Harbor Way · ChargePoint · 2 ports · up to 4 kW · 0.5 mi
- Brisas Del Mar Inn at the Beach 223 Castillo St · 1 port · up to 4 kW · 0.5 mi
- La Playa Inn Santa Barbara 116 Castillo St · Loop · 5 ports · up to 4 kW · 0.6 mi
- Mason Beach Inn 324 W Mason St · EvGateway · 2 ports · up to 4 kW · 0.6 mi
- CSG 401 Shoreline Dr · ChargePoint · 2 ports · up to 4 kW · 0.6 mi
- Beachside Inn 336 W Cabrillo Blvd · Tesla Destination · 1 port · up to 4 kW · 0.6 mi
- Hotel Californian 36 State St · Tesla Destination · 5 ports · up to 4 kW · 1.0 mi
- CSG 215 Helena Ave · ChargePoint · 1 port · up to 4 kW · 1.0 mi
- CSG EV SB Lot 511 Anacapa St · ChargePoint · 3 ports · up to 4 kW · 1.1 mi
More ChargePoint Locations Nearby
- CSG EV SB Ortega 621 Anacapa Street · ChargePoint · 7 ports · up to 4 kW · 1.1 mi
- Sbusd DO 720 Santa Barbara St · ChargePoint · 2 ports · up to 4 kW · 1.3 mi
- CSG EV SB Fleet 630 Garden St · ChargePoint · 16 ports · up to 4 kW · 1.3 mi
- CSG EV SB Granada 1221 Anacapa St · ChargePoint · 2 ports · up to 4 kW · 1.4 mi
- CSG 1221 Anacapa St · ChargePoint · 29 ports · up to 4 kW · 1.5 mi
- SB MTD Staff Parking 550 Olive St · ChargePoint · 1 port · up to 4 kW · 1.5 mi
Frequently Asked Questions
How many chargers are at Santa Barbara City College on 721 Cliff Dr?
Santa Barbara City College has 8 charging ports: 8 Level 2, on the ChargePoint network.
Which plugs does Santa Barbara City College in Santa Barbara have?
J1772, with up to 4 kW.
Is there DC fast charging at 721 Cliff Dr, Santa Barbara, CA 93109?
No. Santa Barbara City College has Level 2 charging only (8 ports). The nearest DC fast charging is CSG EV SB Ortega, 1.1 mi away.
How much does charging cost at Santa Barbara City College, Santa Barbara?
$0.20 per kWh (as listed Oct 19, 2026).
When is Santa Barbara City College in Santa Barbara open?
Mon: 5:00am-11:00pm; Tue: 5:00am-11:00pm; Wed: 5:00am-11:00pm; Thu: 5:00am-11:00pm; Fri: 5:00am-11:00pm; Sat: 5:00am-11:00pm; Sun: 5:00am-11:00pm.
Can anyone charge at Santa Barbara City College in Santa Barbara?
Yes, the chargers are listed as open to the public.