Botw West Left — 500 Capitol Mall, Sacramento, CA 95814
Yes. 500 Capitol Mall has 20 Level 2 public chargers on ChargePoint, up to 4 kW, with J1772 plug. Open 24/7. Verified Oct 20, 2026.
20 Charging Ports at This Location
| Charger | Ports | Plugs | Max power | Network | Price | Status | Source | Access |
|---|---|---|---|---|---|---|---|---|
| Charger 1 | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 20, 2026 | U.S. DOE (NREL) | Public |
| Botw West Right | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 20, 2026 | U.S. DOE (NREL) | Public |
| Botw East Right | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 20, 2026 | U.S. DOE (NREL) | Public |
| Botw East Left | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 20, 2026 | U.S. DOE (NREL) | Public |
| Botw | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 19, 2026 | U.S. DOE (NREL) | Public |
| Botw | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 19, 2026 | U.S. DOE (NREL) | Public |
| Botw | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 19, 2026 | U.S. DOE (NREL) | Public |
| Botw | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 19, 2026 | U.S. DOE (NREL) | Public |
| Botw | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 19, 2026 | U.S. DOE (NREL) | Public |
| Botw | 2 Level 2 | J1772 | 4 kW | ChargePoint | Not listed | Open · Verified Oct 19, 2026 | U.S. DOE (NREL) | Public |
Location Facts
- Network
- ChargePoint
- Hours
- 24 hours daily
- Access
- Public
- Max power
- 4 kW
- Nearest DC fast alternative
- Tesla Supercharger — 0.2 mi, up to 250 kW
- Last verified
Nearest Charging Locations
- Capitol MAL 520 Capitol Mall · ChargePoint · 2 ports · up to 4 kW · under 0.1 mi
- Wells Fargo Building 400 Capital Mall · OpConnect · 1 port · up to 4 kW · under 0.1 mi
- CA-Sacramento Commons 1421 5th St · Blink · 8 ports · up to 4 kW · under 0.1 mi
- The Frederic EV Space 609 Capitol Mall · ChargePoint · 2 ports · up to 4 kW · 0.1 mi
- CA-Sacramento Commons 1501 5th St · Blink · 8 ports · up to 4 kW · 0.1 mi
- CAP Mall 555 Capitol Mall · ChargePoint · 4 ports · up to 4 kW · 0.1 mi
- Capitol MAL Dualstation 621 Capitol Mall · ChargePoint · 8 ports · up to 4 kW · 0.1 mi
- Evergreen 300 Capitol Mall · 4 ports · up to 4 kW · 0.1 mi
- Calpers 400 P St · ChargePoint · 4 ports · up to 4 kW · 0.2 mi
- EvGateway EV Charging 325 L St · EvGateway · 7 ports · 0.2 mi
More ChargePoint Locations Nearby
- Kimpton Sawyer Hotel 500 J St · ChargePoint · 14 ports · up to 4 kW · 0.3 mi
- CalPERS 400 Q St · ChargePoint · 65 ports · up to 4 kW · 0.3 mi
- J Sawyer GA 560 J St · ChargePoint · 4 ports · up to 4 kW · 0.3 mi
- ChargePoint EV Charging 1289 Front Street · ChargePoint · 10 ports · up to 4 kW · 0.3 mi
- DGS Ofam Lot 1500 10th Street · ChargePoint · 9 ports · up to 4 kW · 0.3 mi
- ChargePoint EV Charging 500 R St · ChargePoint · 5 ports · up to 3 kW · 0.4 mi
Frequently Asked Questions
How many chargers are at Botw West Left on 500 Capitol Mall?
Botw West Left has 20 charging ports: 20 Level 2, on the ChargePoint network.
Which plugs does Botw West Left in Sacramento have?
J1772, with up to 4 kW.
Is there DC fast charging at 500 Capitol Mall, Sacramento, CA 95814?
No. Botw West Left has Level 2 charging only (20 ports). The nearest DC fast charging is Tesla Supercharger, 0.2 mi away.
When is Botw West Left in Sacramento open?
24 hours daily.
Can anyone charge at Botw West Left in Sacramento?
Yes, the chargers are listed as open to the public.