ARE — 303e Binney St, Cambridge, MA 02142

Yes. 303e Binney St has 28 Level 2 public chargers on ChargePoint, up to 4 kW, with J1772 plug. Open 24/7. Verified Oct 21, 2026.

28 Charging Ports at This Location

ChargerPortsPlugsMax powerNetworkPriceStatusSourceAccess
Charger 12 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 22 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 32 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 42 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 52 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 62 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 72 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 82 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 92 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 102 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 112 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 122 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 132 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public
Charger 142 Level 2J17724 kWChargePointNot listedOpen · Verified Oct 21, 2026U.S. DOE (NREL)Public

Location Facts

Network
ChargePoint
Hours
24 hours daily
Access
Public
Max power
4 kW
Nearest DC fast alternative
Twin City Plaza — 0.5 mi
Last verified

Nearest Charging Locations

  • Boston Prop CC 290 Binney Street · ChargePoint · 99 ports · under 0.1 mi
  • ARE Binney OKS 355 Binney Street · ChargePoint · 21 ports · under 0.1 mi
  • ARE Binney OKS 355 Binney Street · ChargePoint · 2 ports · under 0.1 mi
  • ARE Binney 389 Binney St · ChargePoint · 8 ports · under 0.1 mi
  • Boston Prop CC 145 Broadway · ChargePoint · 8 ports · up to 4 kW · 0.1 mi
  • Boston Prop CC 290 Binney Street · ChargePoint · 1 port · 0.2 mi
  • Boston Prop CC Yellow Garage 75 Ames St · ChargePoint · 4 ports · up to 4 kW · 0.2 mi
  • Hampshire 50 Hampshire St · ChargePoint · 2 ports · up to 4 kW · 0.2 mi
  • Techsqgrg4 800 Technology Sq. · ChargePoint · 16 ports · up to 4 kW · 0.2 mi
  • Boston Prop CC West Garage 7 Cambridge Center · ChargePoint · 4 ports · up to 4 kW · 0.3 mi

More ChargePoint Locations Nearby

Frequently Asked Questions

How many chargers are at ARE on 303e Binney St?

ARE has 28 charging ports: 28 Level 2, on the ChargePoint network.

Which plugs does ARE in Cambridge have?

J1772, with up to 4 kW.

Is there DC fast charging at 303e Binney St, Cambridge, MA 02142?

No. ARE has Level 2 charging only (28 ports). The nearest DC fast charging is Twin City Plaza, 0.5 mi away.

When is ARE in Cambridge open?

24 hours daily.

Can anyone charge at ARE in Cambridge?

Yes, the chargers are listed as open to the public.

Related Pages