HELLYER OAKS 166 N. ROLLINS2

HELLYER OAKS 166 N. ROLLINS2 is an EV charging station located at 166 North Rollins Road, Millbrae, California. It offers 2 charging ports on the ChargePoint Network network.

HELLYER OAKS 166 N. ROLLINS2 is an EV charging station in Millbrae, California on the ChargePoint Network network. It has 2 charging ports (2 Level 2 ports) with charging speeds up to 3.7 kW. Access: 24 hours daily.

Location

166 North Rollins Road
Millbrae, CA 94030

Coordinates: 37.6006370, -122.3858470

Access: public — Public

Network

ChargePoint Network

Charging Details

TypePorts
Level 22

Max power: 3.7 kW

Connector Breakdown

ConnectorLevelPower
J1772Level 2≤19.2 kW

Hours & Access

24 hours daily

Nearby Charging Stations

Frequently Asked Questions

How many charging ports does HELLYER OAKS 166 N. ROLLINS2 have?

HELLYER OAKS 166 N. ROLLINS2 in Millbrae, California has 2 Level 2 ports on the ChargePoint Network network.

What connector types are available at HELLYER OAKS 166 N. ROLLINS2?

HELLYER OAKS 166 N. ROLLINS2 supports the following EV connectors: J1772.

What charging speeds are available at HELLYER OAKS 166 N. ROLLINS2?

HELLYER OAKS 166 N. ROLLINS2 provides Level 2 charging at up to 3.7 kW. DC fast charging is not available at this location.

What are the hours for HELLYER OAKS 166 N. ROLLINS2?

HELLYER OAKS 166 N. ROLLINS2 is accessible 24 hours daily.

Who can use HELLYER OAKS 166 N. ROLLINS2?

HELLYER OAKS 166 N. ROLLINS2 access: public — Public.

Where is HELLYER OAKS 166 N. ROLLINS2 located?

HELLYER OAKS 166 N. ROLLINS2 is located at 166 North Rollins Road, Millbrae, CA 94030.

Station Actions

Is This Information Correct?

Station details change frequently. If this station's hours, pricing, or availability are wrong, view on the map and submit a correction to help fellow EV drivers.